So I'm tiling a laundry room and there is a doorway that leads to a carpet hallway. When the house was built, they left the laundry room unfinished, so there was just a bare concrete floor and there's a strip that the carpet is tucked into stuck to the concrete.
What's sort of transition do I need here or do I need to tear the door/frame out and remove that existing strip?
[link] [comments]