I'm installing a neo-angle shower kit in the basement bath , but we are tiling the back walls. The kit (Jade bath from Costco) has the wall jambs installing into the outer wall.. but I'm assuming these instructions are for having the plastic back board kit. Would it be better to have the wall jambs on before tiling to reduce the gaps from the grout lines? Or is that just a way for water to get behind the structure.
[link] [4 comments]